Port Costs

Summary of port costs / Different alternatives

  • Vessel's name

  • MV TBN PANAMAX

  • Dwt/Grt/Nrt

  • 68.541

  • 36.097

  • 23.461

  • Loa/Beam/Depth

  • 225,00

  • 32,24

  • 18,30

  • Fiscal Coeficient

  • 167

  • Ports

  • San Lorenzo

  • B Blanca

  • Necochea

  • N Palmira

  • Total

  • Loa/Beam/Depth

  • 200.963

  •  

  • 135.495

  •  

  • 336.458

  • Up river + Bahia Blanca

  • 200.963

  • 145.238

  •  

  •  

  • 346.201

  • N Palmira + Bahia Blanca

  •  

  • 146.218

  •  

  • 120.935

  • 267.153

  • Necochea (full cargo)

  •  

  •  

  • 176.274

  •  

  • 176.274

  • Necochea + Bahia Blanca

  •  

  • 161.043

  • 146.374

  •  

  • 307.417

 

Quoted based on September 2013 Tariffs
Pilots tariff have increased around 10 pct as per April 1st, 2013
Not including tug boats up river (requested only for certain terminals)